Sharraxaadda
The pothole in the east bound lanes of W laburnum has opened back up after the pipe repair and pothole patch was completed.
The pothole in the east bound lanes of W laburnum has opened back up after the pipe repair and pothole patch was completed.
2 Faalladas
La qiray RVA: Customer campaigner (Isticmaale Diiwaangashan)
La xidhay RVA: Customer campaigner (Isticmaale Diiwaangashan)
Closed date : 2018-02-09 09:09:01.0
Case was Closed in Cityworks.
Case was Closed in Cityworks.