Description
The pothole in the east bound lanes of W laburnum has opened back up after the pipe repair and pothole patch was completed.
The pothole in the east bound lanes of W laburnum has opened back up after the pipe repair and pothole patch was completed.
2 Comments
ADIは、 RVA: Customer campaigner (Registered User)
クローズド RVA: Customer campaigner (Registered User)
Closed date : 2018-02-09 09:09:01.0
Case was Closed in Cityworks.
Case was Closed in Cityworks.